Ad

Bridgeport to See 27 Sections of City Facing Potential Water Issues for Period of May 22 through June 2

By Connect-Bridgeport Staff on May 22, 2023 via Connect-Bridgeport.com

UPDATED:
 
Please be advised that the Bridgeport Water Department will be flushing fire hydrants throughout the City of Bridgeport. This is an on-going project that will continue through Fall 2023.
 
City Employees will be flushing fire hydrants, weather permitting, Monday, May 22, 2023 through Friday, June 2, 2023, in the following areas of Bridgeport:

Week 7:  May 22, 2023 –May 26, 2023

Benedum Dr.
Corbin Branch Rd.
Diamond Cove Rd.
Joy Lane
Meadow View Development
North Wedge St.
Oakridge Lane
Professional Place
South View Dr.
South Wedge St.
White Oaks Blvd.
 
Week 8:  May 30, 2023 – June 2, 2023

Barrington Court
Bedford Court
Benedum Dr.
Berkshire Circle
Betten Court
Chester Dr.
Conference Center Way
Daniel Dr.
Denton Dr.
Forrester Blvd.
Genesis Blvd.
Haden Blvd.
Marketplace Ave.
Parkview Dr.
Route 131
Sheffield Court

 
It is possible, but not likely, that residents may experience some discoloration, cloudy water, low pressure, or temporary loss of service of water during this period. The City will not be responsible for any damage caused by discolored water.
 
Call (304) 842-8231 for more information.



Connect Bridgeport
© 2024 Connect-Bridgeport.com