Ad

Bridgeport to See 31 Sections of City Facing Potential Water Issues for Period of August 2 to August 13

By Connect-Bridgeport Staff on August 02, 2021 via Connect-Bridgeport.com

Please be advised that the Bridgeport Water Department will be flushing fire hydrantsthroughout the City of Bridgeport. This is an on-going project that will continue through September 2021.
 
Due to unforeseen delays, Week 11 was not completed this week and will continue into next week.
 
City Employees will be flushing fire hydrants, weather permitting, Monday, August 2, 2021 through Friday, August 13, 2021, in the following areas of Bridgeport:
 
WEEK 11
Center Court
Ross St.
Circle Dr.
Stout St.
Davisson St.
W. Olive St.
Dunkin Ave.
W. Philadelphia Ave.
E. Philadelphia Ave.
W. Smith St.
Glen Ave.
Worthington Dr.
Jones Ave.
Worthington Place
Pearcy Ave.
Zappia Dr.
 
 
WEEK 12
Brightridge Dr.
Meadow Ln.
Deerfield Dr.
Oakdale Ave.
E. Shannon Rd.
Ritter St.
Faris Ave.
Stout St.
Hall St.
W. Philadelphia Ave.
James St.
Water St.
Johnson Ave.
Wyatt. St.
Long St.
 
 
 
It is possible, but not likely, that residents may experience some discoloration, cloudy water, low pressure, or temporary loss of service of water during this period. The City will not be responsible for any damage caused by discolored water.
 
Call (304) 842-8231 for information.



Connect Bridgeport
© 2024 Connect-Bridgeport.com