Ad

Road Closure on U.S. 250 Begins Today; Work Expected to Last Through Oct. 8

By Connect-Bridgeport Staff on October 03, 2022 via Connect-Bridgeport.com

There will be a road closure on US 250, between Muriale’s Restaurant and Wood’s Boat House, from 8 p.m. to 6 a.m. Monday, Oct. 3 through Saturday, Oct. 8, for the installation of drainage structures and drainage pipe for a rockfall protection project.
 
Night-time operations only.



Connect Bridgeport
© 2024 Connect-Bridgeport.com