Ad

Work Taking Place on I-79 in Clarksburg, Bridgeport

By Connect-Bridgeport Staff on July 16, 2018 via Connect-Bridgeport.com

Motorists traveling north on Interstate 79 should execrise a bit of caution as work is being done - appears to be paving work and patching - on the section of roadway starting before the 119 on-ramp from U.S. Route 50 and ending just before the off ramp at Exit 121 or the Meadowbrook Mall exit.
 
Two lanes remain open and traffic was moving at brisk pace at 10 a.m. There was a slight backup on the 119 off ramp. 
 
 



Connect Bridgeport
© 2024 Connect-Bridgeport.com